AluFix solved the challenge

In Torggata, in the middle of Oslo’s nightlife district, MA Entreprenør renovated a historic five-storey residential building. One challenge was the necessary raising of the ceiling in the basement from 1.8 to 3.7 m. When building in existing structures, the lightweight multi-purpose formwork AluFix came into its own.

Extension of the Vienna metro

An important future-oriented public-transport project is being carried out in Vienna: the central transfer hub in the inner-city metro network. The extension in the middle of the city requires tightly scheduled construction plans, optimum processes and clever solutions from the Arge U2xU5 consortium responsible for the project.

Kaiser Carré Siegburg

In the heart of the German town of Siegburg, the Kaiser Carré, a combined commercial and residential building, is coming into being in the highly frequented pedestrian zone.

Masterly stand renovation

The football fans who support VfB Stuttgart are happy: Their club managed to avoid relegation from the Bundesliga, Germany’s top league, at the end of the last season and returned recently to a freshly modernised home base. The sixth-largest stadium in Germany shines in new splendour after the complex renovation of the grandstand. MEVA delivered special solutions, formwork, shoring tower systems and the formwork planning.

Modern home for gymnasts

In Lenzburg something really spectacular has been created for a large number of gymnasts from the Swiss canton Aargau: The gymnastics centre, which opened on schedule, is a purpose-built facility built with loving attention to detail and with high architectural concrete walls that were erected rapidly by the construction company Treier AG using Mammut XT formwork.

Unique Tunnel Arch

MEVA modelled and planned a combined formwork system made up of custom and standard panels in order to build an architecturally challenging cycling tunnel in the German city of Mannheim.

Y-shaped eye-catcher

As prime contractor, DYWIDAG built an attractive hotel near Vienna. Formwork and shoring tower systems from MEVA supported the successful execution of this project.

All expectations reliably fulfilled

In the Swiss town of Baden twelve single-family terraced houses are being built. Hächler AG Hoch- und Tiefbau created each large-format party wall between the individual houses in a single cycle. The result meets the concrete surface quality required by the principle as well as the architects’ and the construction company’s expectations.

New living space in Stockport

An exciting new development in Stockport, England, comprises two residential buildings with 202 apartments for the private rental sector. The Springmount Mill apartments are named after a mill that once stood on the site. The construction company is using MEVA formwork technology for the first time.

One happily takes a look underneath

St. Alban is the green district of Basel and one of its most beautiful neighbourhoods. So why build a footbridge here of all places only on the basis of practical criteria? To produce a new crossing point, money was invested in ­extraordinary design and architectural ­concrete. This paid off.

Residential complex Handelskai 214A

On construction sites in the middle of large cities there is often an acute ­shortage of space, and only a fraction of the ­construction area is available for storage ­purposes. ­Optimum logistics and low ­material ­requirements are thus prerequisites for the successful realisation of projects. During the construction of a residential complex in Vienna, the MevaDec slab formwork made an important contribution to fulfilling these.

Time savings on 155,000 m²

In Tournai, Belgium, a modern hospital complex is being built: the extension of the Centre Hospitalier de Wallonie picarde (CHwapi). With MevaDec, MEP and MT 60 systems, 155,000 m² of slab area, distributed over ten storeys, are being concreted quickly.