Fast construction progress through one-sided tieing
With the clever combination tie-hole, MEVA combines three tying methods in one system. The gain in flexibility and speed, especially with single-sided tying, convinced the construction professionals at Rapp. The company relies on the new wall formwork StarTec XT and used it for the first time in the construction of an apartment building in the district of Rottweil. MEVA took over the planning and guided the construction company during the first use.
Data & Facts
- Project
- Apartment building, Rottweil, Germany
- Contractor
- Rapp Bauunternehmung e.K.
- MEVA systems
- Wall formwork AluStar
- Wall formwork StarTec XT
- Planning and support:
- MEVA Schalungs-Systeme GmbH, Haiterbach, Germany

StarTec XT convinces on job site
Compatible with AluStar
Elements of the AluStar wall formwork were used in the corner areas. The lightweight aluminium formwork can be moved by hand. In combination with the new StarTec XT, this offers numerous advantages. Both systems are fully compatible and require no additional connecting elements apart from the assembly lock.
Corner elements cleverly combined
By using outside corners with a side length of 0 cm and the XT taper tie rod, wall and corner areas could be easily anchored on one side. With only three outside corners (side lengths 0 cm, 5 cm, and 10 cm) and one inside corner (25 cm), all wall thicknesses commonly used in residential construction can be formed without compensation
Faster thanks to StarTec XT
Entrepreneur Wolfram Rapp is very satisfied with the results. "StarTec XT is a great system. Thanks to the cone anchors we work faster than before. Also, we have received a helpful software for formwork planning from MEVA. With it, we will be able to plan simple floor plans ourselves in the future. In short: The investment has paid off.