Press-Releases
-
Smooth-running project (22 MB)
Hospital building in the Black Forrest erected by Glöckle on time using MEVA formwork
-
Parking deck Apollovej in Denmark (26 MB)
The new MevaDec generation stands out due to rapid reusability, simple handling, flexibility and optimised on-site material requirements.
-
Living space arises out of a problem zone (32 MB)
Walls and shaft built in confined space on arterial road in Paris
-
Six-story-office block in Cyprus (31 MB)
In Limassol, Cyprus's second largest city, the shell for a six-storey office block has been completed. The project on the Mediterranean island saw the contractor deploy MEVA's formwork systems for the first time. The Managing Director is convinced of the result and the service.
-
MEVA32 and StarTec used for new building at copper mine (4 MB)
At the Los Pelambres mine in Chile, some 175,000 tonnes of ore are processed every day for copper extraction. To boost output, the engineering company Tecnasic was contracted to expand the infrastructure. GFS supplied both advice and the formwork technology.
-
Glamorous touch added to airport: Specially designed formwork for paired architectural concrete columns in Frankfurt (25 MB)
The new terminal project currently on site at Frankfurt Airport excels with an architectural splendour that is evident down to the last detail and manifest in the paired architectural concrete columns cast with custom-designed MEVA formwork.
-
With the help of MEVA Radius, a building envelope for a centrifuge has been built in Delft (24 MB)
A somewhat unusual construction site in the Dutch city of Delft required absolutely precise formwork: the single-story rotunda for a centrifuge must be able to withstand large forces.
-
New construction at Germany’s oldest car dealer in Karlsruhe (32 MB)
A 12-metre-high commercial building was erected in the German city of Karlsruhe using MEVA wall formwork and supported by MT 60 shoring towers.
-
With back-step method and bracing - The construction of a new warehouse next to an existing building requires precision work (15 MB)
During the construction of a new warehouse in Switzerland, the erection of the initial formwork directly next to the adjacent building was performed without a hitch. The Mammut XT wall formwork system with single-sided tying did an excellent job.
-
Bjørnegård Tunnel in Norway (31 MB)
When equipment rooms have to be integrated into new tunnel tubes as well, the available space is inevitably confined. Hence, when pouring corresponding walls in a Norwegian road tunnel, simple handling and ease of use were important factors – and the strengths of the MEVA’s AluFix system. The heavy work was tackled using Mammut 350.
-
Quick and flexible adaptation of MAC (7 MB)
In Western Australia the city of Perth attracts a great many visitors due to its culture and social events. For this reason, a new hotel has been built near the well-known Swan River to offer guests a pleasant stay.
-
New MevaDec generation (22 MB)
Ease of cleaning, ergonomics and low weight are decisive factors for the use of modular slab formwork systems. With the further development of the tried-and-tested MevaDec, MEVA fulfils these requirements and offers a new generation of this smart syste.
-
Mammut XT - bauma 2016 (49 MB)
-
Fast Assembly, Safe Operation (50 MB)
-
One floor higher per week (50 MB)
-
Stricter standards in Copenhagen (68 MB)
-
Two bridges are better than one (77 MB)