Die Deckenschalung MevaDec in Kombination mit Stützen von MEVA.

New MevaDec generation

Ease of cleaning, ergonomics and low weight are decisive factors for the use of modular slab formwork systems. With the further development of the tried-and-tested MevaDec, MEVA fulfils these requirements and offers a new generation of this smart system.

Data & Facts

  • Project
    • Office building, Waldmössingen (GER)
  • Contractor
    • PreArt Bau GmbH, Schönaich
    • Züblin AG (general contactor)
  • MEVA systems
    • MevaDec slab formwork
  • Engineering and support
    • MEVA Schalungs-Systeme GmbH, Haiterbach, Germany
Stapel mit neuen MevaDec Elementen auf einer Baustelle

New MevaDec generation

Practical properties and convincing results

 

Ease of cleaning, ergonomics and low weight are decisive factors for the use of modular slab formwork systems. With the further development of the tried-and-tested MevaDec, MEVA fulfils these requirements and offers a new generation of this smart system. 

The improved cross-section of the MevaDec edge profile and the modified primary beam groove reduce the concrete adhesion to a minimum. In addition, the new generation has optimised handling properties thanks to integrated grip profiles and stands out due to its low weight. Based on all the tried-and-tested system advantages of the previous version, the new MevaDec still offers the three well-known forming methods.

Rapid construction progress
The new slab formwork has already proven its worth during construction site applications and has impressively demonstrated its practical suitability. “Early stripping and the resulting reduction of material stock on the construction site provides us with clear benefits in terms of rapid construction process,” says Züblin site manager Sascha Grübel. The project manager responsible, Hartmut Schnizer, from PreArt Bau agrees with him and says, “For me, MevaDec is the first choice, and with the new generation, we now have even more application advantages.” 


Simple cleaning
The present construction project in Waldmössingen comprises an office building with three storeys as well as additional slab areas in an adjacent factory building. The numerous construction site applications have shown that MevaDec is easy to clean (see right-hand photo). Thanks to the new design, the cleaning effort has been reduced to a minimum, thus saving time and costs. The new MevaDec generation thus ensures that all tasks involved in the forming of slabs can be performed more efficiently.

 

Die Deckenschalung MevaDec in Kombination mit Stützen von MEVA.